  • Roadside mulching
    Roadside mulching on Greenwood Drive (by lot 8) is in progress and will continue into next week, weather permitting. Flagmen will be present as needed to assist with traffic flow. Drivers should use caution in these designated work zones.
  • Leisure Trail Asphalt Repairs
    Leisure trail repairs are scheduled for the week of November 8th along Lighthouse Road leisure trail, from Plantation Drive to Lighthouse Lane. Flagmen will be present to assist pedestrians.
  • Leisure Trail Tree Trimming
    Leisure trail tree trimming will take place the week of November 8th in the Club Course area, between Water Oak Drive and Wood Duck Road, and between Acorn Lane and Otter Road. Leisure trails will remain open and we ask that pedestrians and bikers proceed with caution. Flagmen will be present, as needed.
  • Catch Basin Maintenance
    Beginning the week of November 8th crews will be conducting beach walk catch basin inspections starting with Beachwalk #11 working upwards, weather permitting
  • Lagoon Tree Trimming
    Lagoon tree trimming behind Lawton Villas will be conducted next week.

Stormwater Ditch Cleaning
Crews began ditch cleanout Wednesday, November 3rd (pictured) in the Heritage Woods neighborhood in proximity to the following areas:

  • #60, 61, 62 & 64 Heritage Road
  • # 1 & 3 Harleston Green
  • # 24 & 26 Old Military Road

The work should take approximately 14 business days, weather permitting.