Sea Pines CSA Maintenance Projects Around the Community (11/11/21-11/18/21)
Holiday Decorations and Lighting Installation
Holiday decoration and light installation are in progress. Holiday lights will be turned on after the Thanksgiving holiday.
Roadside mulching
Roadside mulching on Greenwood Drive (by lot 8) is in progress and will continue into next week, weather permitting.
Leisure Trail Asphalt Repairs
Leisure trail repairs are scheduled to continue through next week along Lighthouse Road leisure trail, from Plantation Drive to Lighthouse Lane. Flagmen will be present to assist pedestrians.
Leisure Trail Tree Trimming
Leisure trail tree trimming is postponed until the week of November 15th in the Club Course area, between Water Oak Drive and Wood Duck Road, and between Acorn Lane and Otter Road. Leisure trails will remain open and we ask that pedestrians and bikers proceed with caution. Flagmen will be present, as needed.
Catch Basin Maintenance
Due to weather delays, crews will begin conducting beach walk catch basin inspections the week of November 15th starting with Beachwalk #11 working upwards, weather permitting
Lagoon Tree Trimming
Lagoon tree trimming behind Lawton Villas will continue through next week.
Stormwater Ditch Cleaning
Crews will begin ditch cleanout the week of November 15th in proximity to the following areas:
- Plantation Drive Near Spanish Moss Road
- Lawton Drive and North Sea Pines Drive Intersection