Updates From The Sea Pines CSA Maintenance Department Beach Walk Repairs Minor concrete repairs will occur at beach walks 11, 16, 17, and 47. We will be removing the existing damaged concrete and replacing them at the same width. The beach walks will be accessible during this work, however, we ask that pedestrians proceed with caution as this will be an active work zone. Our contractor mobilized on 3/14 and the work will continue through the end of this week. Working hours will be between 7:30 AM and 6:00 PM. Tree Work to occur along Plantation Dr. And Lighthouse Rd. Tree work will occur along Plantation Dr. And Lighthouse Rd.Our on 3/26,3/27,3/28. The road and leisure trail will be open, however, we ask residents to use caution when traveling through the area as it may be an active work zone. Our tree contractor will have their crew members help secure and stop traffic/pedestrians as needed. Working hours will be between 7:30 AM and 5:00 PM. Questions about a CSA Mintenance Project? Contact the Maintenance Department by email at csamaintenance@csaseapines.com or by phone 843.671.7849.