Community Updates

Beach Walk and Board Walk #18 Closed For Replacement/Extension

Beginning the week of March 15th, Sea Pines CSA contractors will begin replacement and construction work on CSA beach boardwalk #18 (between Green Wing Teal Rd. and Cedar Waxwing Dr). Boardwalk #18 has exceeded its useful life and must be replaced. During this work, the boardwalk will also be extended by 120 feet over the dune to aid in the protection and allow the dune to continue to build. This work will take approximately 1 to 2 weeks, weather permitting. The beach boardwalk access will be closed to all pedestrian traffic during this time.