Phase 3 of the Sea Pines Drive infrastructure repair project is underway with a completion time of Spring 2023.

  • Work will be performed Monday – Friday from 7 am – 6 pm. Traffic control will be present in the work zone, as needed.
  • Please observe and obey all traffic management personnel, signage, and devices.
Stormwater Drainage Work on Wagon Road to Begin Week of February 27th

  • Project work (drain pipe excavation and replacements) in this area will take 4-6 weeks to complete, weather permitting.
  • Single-lane road closures and flagging operations will be in place.

Major Roadwork along Sea Pines Drive from Lighthouse Road to Baynard Cove Road to Begin Week of March 6th

  • Roadway widening, construction, and milling operations scheduled to begin the week of March 6th.
  • Project work will take 3-4 weeks to complete, weather permitting.
  • Single-lane road closures and flagging operations will be in place.
  • Motorists should expect traffic delays.
South Sea Pines Drive Leisure Trail Timber Bridge Replacement Project

The existing leisure trail pedestrian bridge located along South Sea Pines Drive in proximity to Beach Marker #24 (located between Black Skimmer Lane and Royal Tern Road ) has exceeded its useful life and must be replaced.

Sea Pines CSA contractors were scheduled to begin demolition and reconstruction work this week, but due to supply chain shortages the start date has been delayed.

Once project work begins, it will take approximately 4-6 weeks, weather permitting. During this time, pedestrians and cyclists will need to use the leisure trail detour as the bridge will not be available for use. Click here to view the detour map.

Tree Work

  • Tree work along Sea Pines Drive from Greenwood Lane to Baynard Cove Road is in progress.
  • Tree work along Sea Pines Drive from Baynard Cove Road to Lands End Road scheduled to begin the week of March 6th.
  • Single lane closures and flagging operations will be in place. Please use caution while driving in this area

Leisure Trail Construction and Enhancements

  • Leisure trail construction from Lighthouse Road to Greenwood Drive/Sea Pines Drive Intersection and from Greenwood Drive to Baynard Cove Road is nearing completion.