Community Updates

Pedestrian Beach Lagoon Timber Bridge Replacement Announcement

The existing wood timber pedestrian bridge located on Beach Lagoon Road (in proximity to Beachwalk 35A) that crosses over the lagoon has exceeded its useful life and must be replaced. Sea Pines CSA contractors are scheduled to begin demolition and reconstruction work the week of September 5th.

Project work will take approximately 6-8 weeks, weather permitting. During this time, pedestrians will need to use the detour to Beachwalk 35A as the bridge will not be available for use. Click here to view the detour map.