North Sea Pines Drive Improvement Project Nearing Completion

  • Site cleanup, including roadside grading and landscape cleanup, is underway.
  • Installation of traffic and pedestrian signage is currently in progress.
  • Crews applied temporary line striping to the newly reconstructed and paved roadway and will return after the necessary curing period to complete permanent line striping and install roadway reflectors.

Stormwater Drainage Work at Beachwalk #45

Master stormwater drainage work at Beachwalk #45 in the North Sea Pines Drive project area, between Green Heron Road and Sandhill Crane Road, is scheduled to be completed by the end of the week, weather permitting.

The beachwalk will remain open, but we ask that pedestrians use caution while in the area.

(Pictured: Pile of the Removed Failed Stormwater Drainage Pipe)