Community Updates

Beach Lagoon Pedestrian Timber Bridge Replacement In Progress

The existing wood timber pedestrian bridge located on Beach Lagoon Road (in proximity to Beachwalk 35A) that crosses over the lagoon has exceeded its useful life and must be replaced. Sea Pines CSA contractors began demolition and reconstruction this week.

Project work will take approximately 6-8 weeks, weather permitting. During this time, pedestrians will need to use the detour to Beachwalk 35A as the bridge will not be available for use. Click here to view the detour map.