Stormwater Drainage Work on Wagon Road (Road Closure Updates)

Stormwater drain pipe installation (pictured) is in progress and will continue through next week, weather permitting.

Partial Roadway Closure Extended through 4/21

  • A partial Roadway closure is in place between Liberty Place and #19 Wagon Road and will continue through Friday, April 21st. Click here to view the detour map of the road closure.
  • Traffic control will be in place to reroute motorists. No Thru Traffic.

Road Closure at the intersection of South Sea Pines Drive and Wagon Road will be in Place on 4/24

  • A Roadway closure will be in place at the intersection of South Sea Pines Drive and Wagon Road Monday, April 24th from 8 AM- 5 PM.
  • To access Wagon Road on Monday, April 24th, you will need to use Old Military Road. Click here to view the detour map of the road closure.
  • Traffic control will be in place to reroute motorists.