Stormwater drainage work in the immediate area of Beachwalk #26 to South Sea Pines Drive will begin the week of 1/3
Access to Beachwalk #26 (between Snowy Egret Road and Surf Scoter Road) from South Sea Pines Drive will be limited during this project work (weather permitting).
We ask that pedestrians use caution while in the area.