Sea Pines CSA Capital Projects Resources
Capital Projects & Community Development
(Critical Infrastructure)
The Sea Pines CSA Capital Project and Community Development Department is responsible for repairing, rebuilding, and improving the community’s roads, bridges, leisure trails, beach access points and master drainage systems. This page will be used to communicate helpful information and resources related to Sea Pines CSA Capital & Critical Infrastructure Projects.
If your question is not addressed in the documents and resources found on this page, please send your questions or feedback to the Capital Projects and Community Development Department by clicking here. Sea Pines CSA will continue to update this page with specific information and details as they are available.
Calendar Year 2026
Projects In Progress
- Otter Road and Fawn Lane Infrastructure Improvement Project (Fall 2025-Spring 2026)
Completed Projects
- Lighthouse Lane Infrastructure Improvement Project Phase 3 (Fall 2025-Early Spring 2026)
- Lighthouse Lane (from Mizzenmast Lane to 47 Lighthouse Lane)
- Mizzenmast Lane (from Lighthouse Lane to intersection of Windjammer Court)
- Spinnaker Court
Planned
- Lighthouse Lane Infrastructure Improvement Project Phase 4 (Fall 2026-Spring 2027)
The Critical Infrastructure Collection and Spending Recap Presentation
11/19/24 – Click Here to view the Critical Infrastructure Collection and Spending Recap Presentation
Past Projects
Calendar Year 2025
- Lighthouse Lane Infrastructure Improvement Project (Phase 2)
- Lighthouse Lane from Mizzenmast Lane to 41 Lighthouse Lane
- Along the 18th Fairway of Harbour Town Golf Links
- Spinnaker Court
- Club Course Drive to Greenwood Gate Leisure Trail Infrastructure Project
- Greenwood Drive Survey Work
- From Plantation Drive to South Sea Pines Drive
- Sea Pines Drive Infrastructure Improvement Project (Final Phase)
- From Merganser Court to the end of South Sea Pines Drive (stopping at the entrance of Lands End).
- Lighthouse Lane Infrastructure Improvement Project (Phase 1)
- From Lighthouse Road to Mizzenmast Lane
Calendar Year 2024
- Plantation Drive Leisure Trail Improvement Project
- From Lighthouse Road to the Stoney-Baynard Ruins
- Marsh Island Bridge
- Sea Pines Drive Infrastructure Improvement Project (Phase 4)
- Sea Pines Drive from Baynard Cove Road to Gadwall Road
- Scaup Court: Drainage construction and resurfacing/paving roadway
- March 2024 Video Update: https://youtu.be/5hkBriagymg
Calendar Year 2023
- Beach Boardwalk #46 – February 2023
- Beach Boardwalk #43A – April 2023
- Beach Boardwalk #45 – May 2023
- Sea Pines Drive Infrastructure Improvement Project (Phase 3) – June 2023
- 1.2 miles of Sea Pines Drive from Lighthouse Road to Baynard Cove Road
- Wagon Road – Drainage construction and resurfacing/paving roadway
- South Sea Pines Drive Leisure Trail Timber Bridge Replacement
- Greenwood Drive Leisure Trail Extension – October 2023
Calendar Year 2022
- North Sea Pines Drive Infrastructure Improvement Project (Phase 2) – Spring 2022
- Beach Boardwalk #15– March 2022
- Beach Boardwalk #17– March 2022
- Beach Boardwalk #41– March 2022
- Beach Boardwalk #41A– April 2022
- Beach Boardwalk #44– May 2022
- Construction of a new beach boardwalk and paver walkway at Beach Marker #4– Completed June 2022
- Spartina Bridge Railing Replacement– June 2022
- Leisure trail kiosk Improvements at 3 locations- Completed 1st Quarter 2022
- Beach Lagoon Pedestrian Timber Bridge Full Replacement (BW35A) – October 2022
- Greenwood Drive Repaving Project (Greenwood Drive From Sea Pines Circle to Club Course) – December 2022
- Sea Pines Drive Infrastructure Improvement Project (Phase 3)
- Sandhill Crane Road – Resurfacing/paving roadway- September 2022
- Red Cardinal Road – Drainage construction and resurfacing/paving roadway- November 2022
- Snowy Egret Road – Drainage construction and resurfacing/paving roadway- December 2022
Calendar Year 2021
- North Sea Pines Drive Infrastructure Improvement Project Phase 1 – April 2021
- North Sea Pines Drive, from the Lighthouse Road Intersection to Red Cardinal Road
- Stormwater repairs, leisure trail reconstruction, roadway realignment, tree work, and restriping of the roadway between Lighthouse Road and Red Cardinal Road.
- Beach Boardwalk #18 – April 2021
- Beach Boardwalk #35A – April 2021

Question about a capital Project?
Submit your questions or comments through our online submission form.
Sea Pines Utility Company Resources
For Water Service interruptions, please contact South Island Public Service District:
- (843) 785-6224
- https://www.sipsd.com/contact
For Power Outage information please contact Palmetto Electric Cooperative
- 1 (866) 445-5551
- View the Power Outage Map / Report an outage: https://www.palmetto.coop/report-power-outage
For Cable and Internet service interruptions please contact your provider
- Spectrum: (833) 267-6094
- Hargray: (877) 427-4729